Residente

Anne-de-Bretagne bridge closed to cars: navibus N1 stepped up

Le pont Anne-de-Bretagne à NantesIllustrazione
Illustration: Chabe01, CC BY-SA 4.0, via Wikimedia Commons

· Rezé Mensuel n°188 (avril 2024), p. 13 — Ville de Rezé

From late April 2024 to May 2025, the Anne-de-Bretagne bridge and boulevard Léon-Bureau are closed to vehicles in both directions, with only pedestrians, cyclists and emergency services allowed through, as part of the works linked to the arrival of the tram. To help Rezé residents, including those of Trentemoult, get around, Nantes Métropole planned measures: crossings doubled on navibus N1, with a boat every ten minutes and service extended to 9 pm, stronger frequency on several transit lines, a free one-month trial of the Naolib network and extra electric bikes for long-term rental.

Read the original article on Rezé Mensuel n°188 (avril 2024), p. 13 — Ville de Rezé

Issue PDF

Summary written by trentemoult.com from the cited article. Rights to the original text and photos belong to their authors.

Other news

An idea, a suggestion, a complaint? Write to contact@trentemoult.com.