Major works to free the harbour from silt
· 20 Minutes
In late 2019 major dredging works began at Trentemoult harbour, regularly filled by Loire sediment.
Thousands of cubic metres of silt were to be removed so boats could get in and out again.
Five years later the metropolis changed its approach (see the December 2024 item).
Summary written by trentemoult.com from the cited article. Rights to the original text and photos belong to their authors.
Other news
Le Bonbon Nantes features Trentemoult
IllustrationIllustration: trentemoult.com Online magazine Le Bonbon Nantes has published a piece on Trentemoult, one of the most photogenic spots around Nantes, and explains where the colours of the façades really come from.
Le Bonbon Nantes
Trentemoult now has its own radio station

Photo: Radio Trentemoult Radio Trentemoult streams online 24/7, with a 2026-2027 schedule that mixes music, village stories and a show for young children.
Radio Trentemoult
Octobre Rose: FC Nantes shows off its pink shirt in Trentemoult

Photo: FC Nantes For Octobre Rose, FC Nantes held a photo shoot at the Bistrot du Port, with Manon, Chanel and Noémie wearing the pink collector shirt. Half the profits go to two Nantes charities.
FC Nantes